Ganchong Water Treatment Works, Package 3A — Main Distribution Pipeline, Tanjung Agas, Pahang

A new water treatment facility and transmission pipeline were constructed at Tanjung Agas, forming part of a wider development programme to strengthen water infrastructure across Pahang’s East Coast Economic Region.

Project Details
Owner: East Coast Economic Region Development Council (ECERDC)
Consultant: Ranhill Consulting Sdn Bhd
Main Contractor: Ikatan Gemajaya Sdn Bhd, in joint venture with Taliworks Construction Sdn Bhd
Start Date: 22 September 2016
Completion Date: 21 January 2020
Contract Value: RM73.1 million

Project Description
Body: This package formed part of a new water treatment plant development in Pekan, Pahang, involving construction of a 20 million litre reinforced concrete suction tank, a pump station, a TNB substation, a 4.5 million litre elevated reservoir, and associated works at Tanjung Agas, together with installation of a main transmission pipeline from Peramu to Tanjung Agas.

Scope Of Work

  • Supply and installation of a 1000mm diameter mild steel pipeline, approximately 19km, from Peramu to Tanjung Agas
  • Supply and installation of all valves, fire hydrants, valve chambers, wash-out pipelines, underground piping, piling works, and concrete support installation
  • Supply and installation of pumps and associated works

Status Note
Body: This project was completed as agreed and successfully commissioned. The defects liability period has ended without any major defect issues.