Labohan Dagang Water Treatment Plant Pipeline Works, Package E1

A major transmission pipeline was constructed to carry treated water from the Labohan Dagang Water Treatment Plant to Banting, increasing supply capacity across the Kuala Langat district.

Project Details
Owner: Unit Perancang Ekonomi Selangor (UPEN)
Consultant: Jurutera Perunding Zaaba Sdn Bhd
Main Contractor: Ikatan Gemajaya Sdn Bhd
Start Date: 27 July 2020
Completion Date: 15 July 2022
Contract Value: RM49.3 million

Project Description
Body: This package involved construction of a main transmission pipeline using mild steel (MS) pipes measuring 2000mm and 1600mm in diameter, spanning approximately 14km from Jalan Bukit Jugra to Banting, including valve installation, road and river crossings, utility diversion, and road reinstatement to increase water supply capacity in the Kuala Langat area.

Scope Of Work

  • Supply, installation, testing, and commissioning of 2000mm and 1600mm diameter mild steel (MS) pipelines, approximately 14km, from Jalan Bukit Jugra to Banting
  • Detection of existing utilities, land surveying, and preparation of As-Built drawings
  • Installation of various pipe fittings including butterfly valves, sluice valves, air valves, and related fittings
  • Road and river crossing works, including special pipe installation and crossing structures at affected locations
  • Hot tapping works on existing pipelines for connection to the new water supply system
  • Construction of reinforced concrete structures including valve chambers, thrust blocks, anchor blocks, and piling works

Status Note
Body: This project was completed as agreed and successfully commissioned. The defects liability period has ended without any major defect issues.